To the central content area

2017 Plan of Taitung County’s Water Pollution Source Inspection, Water Pollution Fee Collection, and River Patrolling Team Management.

Absrtact
The implementation period of the project is from February 1, 106 onwards until December 10, 106 up to December 10, 106 projects and the results of the implementation until November 15, 106, the summary is as follows: (A) water pollution prevention and control measures plan and permit application documents review: 1, the project statistics to November 15, 106 has been accepted and assisted in the completion of the review completed 47 times, a total of 76 applications, and the permit application for the first time to review the permit is completed 23 times the survey; another completed 4 times Test report data (the second half of 105, the first quarter of 106, the first half of 106, the second quarter of 106) review, and continue to follow up the progress of the follow-up report. 2, monthly summary of the jurisdiction within the jurisdiction of the effective period of less than 6 months and has not yet applied for the extension of the water permits (documents) information and with the monthly work report submitted to the authorities for review. Statistics to 106/11/15 only, the county should be extended and no list of delays have been raised, including the 7 businesses of Dongshan Sandstone Co., Ltd. (the validity period of the license is up to January 13, 2007). (B) water pollution inspection control and sampling and testing operations: 1. As of 30 October, 270 inspections have been completed with a completion rate of 100%; and 83 sub-sampling tests have been completed with a completion rate of 100%, which are in line with Article 2, paragraph 2 1, paragraph 2. 2. To complete the depth examination of 10 sub-contracting businesses, including the Far EasTone Development Co., Ltd., Taifu Branch of Kaifu Co., Ltd., Taitung Casino Co., Ltd. etc. The related check-up and follow-up results are as in Section 3.2.3. (III) Functional Assessment of Wastewater Treatment Facilities under Management: During the year, the functional assessment operation was completed on August 23, 2006 with on-site assessment (preliminary assessment). On September 21, 106, experts and scholars (Ji Changguo, Wang Safety technician) to carry out on-site re-assessment operations, including written information check-up and process and processing facilities survey and on-site unit processing of water quality sampling, etc., and please complete the inspection and exploration records. According to the results of water quality analysis, held on October 17, 106 units reviewed the functional evaluation to improve the meeting. (D) automatic monitoring of water quality and water (visual) and connection transmission system stability operation: 1, the program continued daily (on the working day of the office) to confirm the connection of the connection objects and successfully eliminate the secondary fault status of the hardware and software of the host end CWMS. 2. In the current year, "Hong Teng Sandstone Co., Ltd." And "Chung Dong Pulp & Paper Co., Ltd. Taidong Factory", which should have CWMS in their respective counties, completed the examination and counseling of the statement of measures and the confirmation report of measures respectively. And conducted a two-stage CWMS inspection and supervision work for the completed CWMS business, "Buddha Factory Co., Ltd. Jilin Plant" (E) assessment of water pollution control fee collection and evaluation of the effectiveness: the county 105 second phase (January 106 to pay) should declare the number of 65 households, the rate of 100% of the total amount of the total payment of 1,207,681 yuan; The first phase (paid in July 106) should declare the number of 111 households, the rate of 100%, the total amount paid a total of 4,328,480 yuan. Call the job, 106 8 years 7 days to complete a call to work 1 (Rihui Chi on Taitung Branch Co., Ltd.). (6) Domestic Sewage Pollution Reduction Operations: This project will promote the downsizing of domestic sewage sources and the recycling and reuse of water resources through the promotion of both venues for propaganda activities. At present, seven campaign films have been completed. And on July 24, sent a letter to the authorities for the examination of the first half results of the 106-year domestic sewage pollution reduction project in Taitung County. (VII) Dealing with Water Pollution Regulation, Policy and Policy Announcement, and Auditing Control Education and Training: During the year, 3 demonstrations on water pollution prevention and control regulations were completed, and indoor pollution control inspection and regulation education and training indoor explanation and factory inspection Times. And on April 18, respectively, on October 3, 800 completed delivery of all propaganda. He has also helped to write a press release related to the protection of the water environment. (VIII) Assisting the authorities to handle the performance assessment of river pollution remediation and marine pollution prevention and control business: On March 24, according to the EPD's review letter of opinion, it was sent to amend the key annual monitoring station of the county's "Annual Report of River Pollution Remediation (including river basin management) Specific As and Key Performance Indicators (KPIs). And on April 11, September 8 each completed a key station Taiping River Fengli Bridge dry season and wet season of the supplementary investigation of the amount of water and recreational drainage, recreation and drainage under the water quality and water supplement survey. Another August 31, September 28, October 30, November 30, respectively, correspondence sent to Taitung County, 106 annual river improvement project report August, September, October and November edition. (IX) Handling of Water Environment Patrol Team Jingxiuchuan and Intensification Training Activities: This year, it has completed 4 sessions of water environment inspection team Jingxiu Pureland and propagandized 5 educational activities. The other from May 3 to May 4 to complete the 106 annual Taitung County Water Environment Patrol Team appearance Mount activities. (X) Assisting Water Environment Patrol Operations: The project has assisted the Water Environment Patrol Corps in handling the notification cases detected during inspections and has registered 41 cases of "Water Conservation Network" and completed the "Annual Report of the Year 106" on November 4 Taitung County Water Environmental Patrol Management Counseling Conference ", shooting the best achievements of the best patrol microfilm" Salvage Guava battles "and re-drawn to complete the re-drawn water environment patrol map. (XI) Other Matching Items: According to the instructions of EPB, monthly self-assessment of water environment inspection of this county shall be submitted to the authorities for instructions on attending 5 related meetings.
Keyword
Water Pollution, Water Pollution Fee Collection, River Patrolling Team Management
Open
top